Route 66 at Route 151 and Depot Hill Road Intersection Improvements (Concept G)
Type:
Large
Complexity:
Moderate
Priority:
Mid term
Cost:
$4,200,000
Goals:
Widen the intersection to improve operation and mitigate delays and queues at the intersection; install multimodal facilities on Depot Hill Road and at the intersection to improve mobility and access of alternative travel modes
Elements:
- Widen Route 66 at the intersection to provide opposing left-turn lanes and two through lanes in each direction along Route 66
- Provide sufficient extension of receiving lanes and downstream lane merges on the departure side of the intersection
- Eliminate the existing channelized right turn lane from Route 151 north to Route 66 east
- Provide shared bike lane and sidewalk on Depot Hill Road extending to the Air Line Trail to the north
- Provide sidewalks, crosswalks, pedestrian signals, and push buttons at the intersection
- Minor right of way taking of private property
Permits:
- Town roadway construction permits for construction within Town right-of-way
- CTDOT approval and/or encroachment permit for construction within CTDOT right-of-way