Route 66 at Lake Drive Safety Improvements (Concept M)
Type:
Small
Complexity:
Moderate
Priority:
Mid term
Cost:
$380,000
Goals:
Realign Lake Drive at Route 66 to improve sightline, intersection geometry, vehicular turning operations and mitigate safety concerns at the intersection
Elements:
- Realign Lake Drive at the Arrow Fence driveway to be perpendicular to Route 66
Permits:
- Town roadway construction permits for construction within Town right-of-way
- CTDOT approval and/or encroachment permit for construction within CTDOT right-of-way