Project 15 – Transit Improvements (Concept N)
< Route 66 Corridor Study Transit Improvements (Concept N) Type: Small Complexity: Low Priority: Short term Cost: $250,000 Goals: Improve transit infrastructure and service to promote alternative travel modes Elements: Formalize bus stop locations at...
Project 14 – Route 66 at Lake Drive Safety Improvements (Concept M)
< Route 66 Corridor Study Route 66 at Lake Drive Safety Improvements (Concept M) Type: Small Complexity: Moderate Priority: Mid term Cost: $380,000 Goals: Realign Lake Drive at Route 66 to improve sightline, intersection geometry, vehicular turning...
Project 13 – Route 66 at Edgewater Hill Driveway Modern Roundabout (Concept L-2)
< Route 66 Corridor Study Route 66 at Edgewater Hill Driveway Modern Roundabout (Concept L‑2) Type: Medium Complexity: High Priority: Long term Cost: $2,300,000 Goals: Improve traffic operation and safety at and in vicinity of the Edgewater Hill...